Indian nuclear reactor achieves global milestone

An Indian made nuclear power plant at Rawatbhata in Rajasthan created history by running un-interrupted and continuously for a period 765 days a little over two years. The 220 MW reactor's achievement beats an American reactor which ran for 739 days at one stretch. Unit-5 at Rajasthan a Pressurized Heavy Water Reactor (PHWR) made in 2010 now takes on the global rank number two. The pole position is still held by a Canadian reactor, Ontario Power Corporation's Pickering-7 plant ran for 894 days, (Photo by Pallava Bagla/Corbis via Getty Images)
An Indian made nuclear power plant at Rawatbhata in Rajasthan created history by running un-interrupted and continuously for a period 765 days a little over two years. The 220 MW reactor's achievement beats an American reactor which ran for 739 days at one stretch. Unit-5 at Rajasthan a Pressurized Heavy Water Reactor (PHWR) made in 2010 now takes on the global rank number two. The pole position is still held by a Canadian reactor, Ontario Power Corporation's Pickering-7 plant ran for 894 days, (Photo by Pallava Bagla/Corbis via Getty Images)
Indian nuclear reactor achieves global milestone
COMPRAR UMA LICENÇA
Como posso usar esta imagem?
R$ 3.000,00
BRL

DETALHES

Restrições:
Contate o escritório local para todos os usos comerciais ou promocionais.
Crédito:
Pallava Bagla / Colaborador
ID Editorial:
526879014
Coleção:
Corbis News
Data da criação:
01 de janeiro de 1900
Data do upload:
Tipo de licença:
Info sobre autorização:
Sem autorização Mais informações
Fonte:
Corbis News
Nome do objeto:
2014-09-0615-35-44-img_8494.jpg
Tamanho máximo do arquivo:
5616 x 3744 px (47,55 x 31,70 cm) - 300 dpi - 8 MB