KENYA-CHINA-TRANSPORT-RAILWAY

Chinese workers stand at the construction site of Standard Gauge Railway (SGR) during the Presidential Inspection of the SGR Nairobi-Naivasha Phase 2A project in Nairobi, Kenya, on June 23, 2018. - The SGR phase 2A project is an 120km extensiton of the Monbasa-Nairobi SGR project (Phase 1) with the longest railway bridge in the country, 5.8km Super Major Bridge, constructed across Nairobi National Park. (Photo by Yasuyoshi CHIBA / AFP) (Photo credit should read YASUYOSHI CHIBA/AFP via Getty Images)
Chinese workers stand at the construction site of Standard Gauge Railway (SGR) during the Presidential Inspection of the SGR Nairobi-Naivasha Phase 2A project in Nairobi, Kenya, on June 23, 2018. - The SGR phase 2A project is an 120km extensiton of the Monbasa-Nairobi SGR project (Phase 1) with the longest railway bridge in the country, 5.8km Super Major Bridge, constructed across Nairobi National Park. (Photo by Yasuyoshi CHIBA / AFP) (Photo credit should read YASUYOSHI CHIBA/AFP via Getty Images)
KENYA-CHINA-TRANSPORT-RAILWAY
COMPRAR UMA LICENÇA
Como posso usar esta imagem?
R$ 3.000,00
BRL

DETALHES

Restrições:
Contacte o representante local para todos os usos comerciais ou promocionais. Direitos editoriais totais no Reino Unido, EUA, Irlanda, Itália, Espanha, Canadá (não inclui o Quebec). Direitos editoriais restritos em qualquer outro local; contacte o representante local.
Crédito:
YASUYOSHI CHIBA / Colaborador
ID Editorial:
982027278
Coleção:
AFP
Data da criação:
23 de junho de 2018
Data do upload:
Tipo de licença:
Info sobre autorização:
Sem autorização Mais informações
Fonte:
AFP
Código de barras:
AFP
Nome do objeto:
AFP_16H29D
Tamanho máximo do arquivo:
6000 x 4000 px (50,80 x 33,87 cm) - 300 dpi - 7 MB